Has actor perspective Developer/Architect
A list of all pages that have property "Has actor perspective" with value "Developer/Architect"
Previous Results 21– 40 Next (20 | 50 | 100 | 250 | 500)
Previous Results 21– 40 Next (20 | 50 | 100 | 250 | 500)
- Need of flexibilization of analytical tools - no overdesigned tool that provides too much features for the use +
- Neighbourhood interrelations should be included in the generator +
- Operational aspects of the system should be enhanced +
- Pareto Frontier Techniques are useful for multi-criteria forest management planning +
- Plan the system architecture based on a broad view of future possibilities +
- Provide missing help-documentation service +
- Provide procedures and structure for complete data flow +
- Providing procedures and structure for data flow from selection of field sample, performing field +
- The DSS models built must match the knowledge of the local forest managers, so the ability for local +
- The ProgettoBosco working methodology, based on cooperation, successive approximations and +
- The adoption of the collaborative learning method made possible to gradually select the conceptual +
- The analysis of the actor network interactions allowed to identify the criticalities to be solved in order to develop the collaborative process +
- The choice to develop the system in an Excel environment was based on the status of computer +
- The definition of standardized and specific criteria for selecting and zoning forest compartment +
- The development of large and enduring systems requires a long term approach +
- The fact that ProgettoBosco is conceived according to the criteria and indicators of sustainable +
- The kinds of DSS traditionally used to calculate timber harvest levels are now being used to model +
- The tracing of the actor network supported the identification of the key actors influencing the collaborative DSS implementation and institutionalization +
- The tracing of the current actor network interactions made the group realize that they need a different kind of stakeholders from what they previously thought +
- The use of structured output (maps, tables and charts) makes the methodology and the results more +